Centralised temporary storage (CTS) facility

High level radioactive wastes remain isolated by three engineered barriers for 60 years.

Imágenes

Vista del edificio del Almacén Centralizado rodeado de edificios del parque tecnológico

Infografía del complejo del Almacén Temporal Centralizado

Interior del almacén.

Interior del almacén temporal de combustible gastado de la central nuclear Trillo. 2001.

Primer plano de elemento prismático siendo depositado en una regilla metálica ubicada en una piscina

Residuos radiactivos de alta actividad - Almacenamiento de un elemento combustible en la piscina de una central nuclear

Más imágenes (7)

Activities and Projects > High Level Wastes

Transport and storage of High Level Wastes

...pools or in containers at the power plant sites.In view of the forthcoming creation of a Spanish Centralised Temporary Storage facility, the need arises to draw up a Transport Plan for the high level wastes to be taken from the nuclear power plants...

Activities and Projects > High Level Wastes

Centralised Temporary Storage (CTS) Project

The Centralised Temporary Storage facility is an installation designed to house the spent fuel from the nuclear power plants and the high level wastes produced in Spain total material to be stored 12,816 m3 at a single location. The facility does...

Activities and Projects > High Level Wastes > Transport and storage of High Level Wastes

José Cabrera nuclear power plant temporary storage facility

The temporary storage facility at José Cabrera nuclear power plant is located on the plant site and has been designed to house all the spent fuel unloaded from the reactor under dry storage conditions. It consists of a reinforced concrete slab...

Activities and Projects > Dismantling and decommissioning of facilities > José Cabrera nuclear power plant decommissioning project

José Cabrera nuclear power plant temporary storage facility

The temporary storage facility at José Cabrera nuclear power plant is located on the plant site and has been designed to house all the spent fuel unloaded from the reactor under dry storage conditions. It consists of a reinforced concrete slab...

Activities and Projects > High Level Wastes > Transport and storage of High Level Wastes

Trillo nuclear power plant temporary storage facility

Since 2002 the Trillo nuclear power plant has had a cask storage facility designed to temporarily house its spent fuel.This is a shed with concrete walls and roof capable of housing 80 dual purpose storage and transport casks. These casks have been...

Activities and Projects > High Level Wastes > Transport and storage of High Level Wastes

Characteristics of storage in pools

Once unloaded from the nuclear reactor, the spent fuel must be kept in storage in pools for it to cool down.The choice of water as a medium for this immediate storage is due to its high heat transfer coefficient, its good properties as a shielding...

Activities and Projects

High Level Wastes

The Parliament considers that the start-up of a Centralised Temporary Storage facility for spent fuel and high level wastes constitutes a priority objective for the country. Description of High Level Wastes High level wastes consist basically of...

Activities and Projects > High Level Wastes > Centralised Temporary Storage (CTS) Project

International references in relation to centralised temporary storage

Most of the countries that have nuclear power plants have opted for temporary centralised high level radioactive waste management solutionsJapan Rokkasho.France La Hague and Cascad.Switzerland Zwilag.Sweden Clab.Belgium Dessel.Germany Ahaus and...

Activities and Projects > Dismantling and decommissioning of facilities

José Cabrera nuclear power plant decommissioning project

...of the facility included the management of the spent fuel removal from the plant pool and transfer to the temporary storage installation and the conditioning of the operating wastes.By Ministerial Order, the Government has approved on February...

Activities and Projects

Dismantling and decommissioning of facilities

...of the facility included the management of the spent fuel removal from the plant pool and transfer to the temporary storage installation and the conditioning of the operating wastes.By Ministerial Order, the Government has approved on February...